One page, every type sold worldwide — with the matching series from our factory.
A hybrid solar inverter combines an MPPT solar charge controller, a battery inverter and a grid/generator charger in one box. Worldwide, they come in five families, split by grid connection, phase and battery voltage. This guide covers them all — and links to the matching series we build for each.
| Type | Output | Battery | Grid role | Best for | Series |
|---|---|---|---|---|---|
| Low-voltage off-grid (all-in-one) | 1–10.2 kW | 12/24/48 V Li or lead-acid | No grid needed; grid/gen optional top-up | Homes, cabins, farms in Africa, Middle East, SEA | SY 系列 → |
| Split-phase (Americas) | 3.5–6.2 kW | 48 V | Off-grid or backup | US / Canada / Mexico / Brazil homes and shops | SY-US 系列 → |
| Three-phase | 6–12 kW | 48 V bank | Off-grid / backup, 3φ motors | Workshops, irrigation pumps, hotels | SY-3P 系列 → |
| Parallel stackable | 6–36 kW | 48 V shared bank | Scalable 1φ or 3φ | Loads that grow — start small, add units | SY-P 系列 → |
| High-voltage grid-tie hybrid | 5–12 kW | 150–500 V HV LiFePO4 | On-grid + backup, export control, peak shaving | Grid-tied homes cutting bills with storage | SY-HV 系列 → |
Off-grid boxes run your loads with no utility at all; a grid or generator input only tops up the battery. Grid-tie hybrids feed the grid, charge from it and switch to battery in <10 ms when the grid drops — with export limits for zero-feed-in tariffs.
Most of the world runs 230 V single-phase; North America runs 120/240 V split-phase at 60 Hz; workshops and pumps need 380/400 V three-phase. Output phase must match your loads — or use three paralleled units to build a 3-phase system.
Low-voltage (12/24/48 V) is the classic choice — cheap, safe, easy to service. High-voltage (150–500 VDC) LiFePO4 stacks cut cable loss and boost efficiency to 97%+, the modern standard for home energy storage.

The factory
Founded 2021 — today 106 staff, 9,000 m² of production, 32 patents and a RMB 150M expansion underway. 1688 “Verified Factory” with 100% on-time delivery. Video tours and third-party inspection welcome.
Visit the factoryTell us your system voltage, load and quantity — an engineer replies with model, price and lead time within one business day.