Straight answers from the factory that builds them: how to calculate DC current, pick the right AWG or mm² for your inverter wattage, and keep voltage drop and heat out of your system.
Short answer: size the wire for the DC current, not the AC wattage. Current = inverter watts ÷ battery voltage ÷ 0.9 efficiency, then add 25% headroom. In practice that means a 1000W/12V inverter wants 2 AWG (35mm²), a 2000W/24V unit wants 2 AWG, and a 3000W/48V inverter only needs 6 AWG (16mm²) — one more reason to buy 48V. Full charts below.
Undersized inverter cable is the single most common installation failure we see in photos buyers send us: melted lug sleeves, hot lugs at the battery, mystery low-voltage alarms at full load. Wire is cheap; rewiring a scorched installation is not. Here is how to get it right the first time.
The inverter pulls far more current from the battery than it delivers on the AC side, because it steps 12/24/48V up to 110/230V. The working formula:
DC amps = inverter watts ÷ battery voltage ÷ 0.9 (efficiency)
At full load, add a 25% safety margin for surges and continuous rating, then choose a wire whose ampacity at 75–90°C exceeds that number. This is also why battery-to-inverter runs should be as short as possible — every metre adds resistance and voltage drop.
| Inverter size | 12V system | 24V system | 48V system |
|---|---|---|---|
| 1000W (~115A + 25%) | 2 AWG / 35mm² | 6 AWG / 16mm² | 10 AWG / 6mm² |
| 1500W (~175A + 25%) | 1/0 AWG / 50mm² | 4 AWG / 25mm² | 8 AWG / 10mm² |
| 2000W (~230A + 25%) | 2/0 AWG / 70mm² | 2 AWG / 35mm² | 6 AWG / 16mm² |
| 3000W (~345A + 25%) | 4/0 AWG / 95mm²+ (not advised) | 1/0 AWG / 50mm² | 4 AWG / 25mm² |
Assumes a short run under 1–1.5 m and fine-stranded pure copper cable. Two things stand out immediately. First, 12V stops making sense past about 1500W — you are buying welding cable to feed a household appliance. Second, the same 3000W load that demands 4/0 AWG on 12V drops to a tidy 4 AWG on 48V. That is exactly how our TS pure sine wave inverter series is deployed in the field, and why the SY hybrid inverter series (3.5–6.2kW) is designed around 48V battery banks from the ground up — thinner copper, cooler terminals, cheaper installs.
The chart assumes short runs. For every extra metre of cable, resistance steals voltage, and the inverter compensates by pulling more current — a feedback loop that ends in a low-voltage shutdown at full load. Keep DC-side drop under 2%:
Use the chart values as-is. This is the target: mount the inverter close to the battery bank, not across the room.
Go one gauge thicker than the chart. Example: 3000W/48V steps from 4 AWG to 2 AWG (25→35mm²).
Move the battery or move the inverter. Long DC runs at high current are money and efficiency set on fire — extend the AC side instead, where current is 10–20× lower.
Fuse: rate it at 1.25–1.5× your calculated DC current and mount it within 30cm of the battery positive terminal. ANL fuses cover up to ~300A; class-T handles the rest and survives fault currents better. Lugs: use tinned copper, crimped with a proper tool — hammer-and-vice crimps are how hot joints start. Cable: fine-stranded pure copper only; CCA (copper-clad aluminium) has no place on an inverter circuit. Torque the DC terminals to the manual's spec and re-check after the first week.
If solar panels feed the bank, remember the charge side needs its own sizing logic: our MPJ MPPT solar charge controller guides cover PV string wire, breaker and PV fuse ratings matched to 10–60A charging current. And if you are starting from scratch, the battery sizing guide pairs with this one — wire and bank are decided together, not separately.
Calculate amps from watts ÷ volts, add 25%, read the chart, and upsize one gauge for runs over 1.5 m. Better yet: choose a 24V or 48V inverter and let the voltage do the heavy lifting — at 48V, a full 3000W load flows through wire you can bend with your hands. Send us your inverter wattage and battery voltage through the form below, and our engineers will confirm the exact cable, fuse and breaker specification for your installation within one business day.
Tell us your system voltage, load and quantity — an engineer replies with model, price and lead time within one business day.